Megawatt-Scale Data Center Power, Live in Weeks, Not Years.

Deploy megawatt-scale power on-site in weeks. SparkCharge bridges you to the grid, carrying your full load now, then keeps optimizing every kWh once you're connected.

Online in as little as 7 days

3000+ kWh capacity

99.9% Uptime

Data center server room powered by SparkCharge

Site power · live

Online

3.8

MW

delivered on-site · bridging to utility

94%

utilization

0

outages

12 d

to deploy

Built for data centers

On-Site Power for Data Centers, Modular and Built to Scale.

Product · recommended

Battery Energy Storage (BESS)

Modular megawatt-scale storage that carries your full rack load, banks off-peak energy, and dispatches on demand.

Explore BESS Solutions

Product

PowerHub Generation

Clean, quiet on-site generation that pairs with storage to bridge megawatt loads with zero grid connection.

Explore PowerHub Solutions

Service

Energy-as-a-Service

The whole system delivered as a managed service, $0 capex, SparkAI-optimized, revenue back to you.

Explore EaaS
Battery Energy Storage system

Battery Energy Storage

Store megawatts. Dispatch on demand.

Modular BESS banks energy when it's cheap and clean, then delivers full rack load the instant compute needs it, the backbone of a grid-independent data center.

MW+

scalable capacity

Modular

stack as you grow

0

emissions on-site

PowerHub Generation systemEnergy-as-a-Service high voltage power lines

Your racks are ready. The grid isn't. Get Data Center Power Now.

The utility route

2-7 years in the interconnection queue

Massive upfront capital commitment

No reliable ways to bridge fap while you wait

Fixed capacity that's hard to scale

The SparkCharge route

Online in weeks, not years

$0 capex, pay for power, not infrastructure

Clean, quiet battery + PowerHub generation

Scales rack-by-rack on demand

Power my data center →

Proof, not promises.
Real Case Studies. Real Deployments.

LATEST FROM THE BLOG

5 Ways to Cut EV Fleet Downtime
with Mobile Charging

Learn More

5 Ways to Cut EV Fleet Downtime with Mobile Charging

Every hour an electric vehicle (EV) sits idle waiting for a charge is an hour it is not earning. For fleet operators running last-mile delivery, rideshare, rental, or shuttle operations, EV downtime is not a minor inconvenience. It is a direct hit to route completion rates, SLA performance, and revenue per vehicle.

Joshua Aviv, CEO SparkCharge, Named to Boston Globe Tech Power Players

FAQ

Data Center Bridge Power FAQ

Have another question? Reach out and our team will get you answers.

Contact Our Team ↗

01

How can data centers get power without waiting on grid interconnection?

SparkCharge deploys megawatt-scale battery storage or on-site PowerHub generation directly to your data center site, carrying your full rack load without waiting on the utility interconnection queue. Instead of the 2 to 7 years a new grid connection can take, SparkCharge gets you online in as little as 7 days, then keeps optimizing every kWh once you're connected to the grid.

02

How much power can SparkCharge deliver to a data center?

SparkCharge's Battery Energy Storage (BESS) can be modular and scale to megawatt-plus capacity, sized to carry your full rack load regardless of site size. Because the system stacks as you grow, capacity can expand alongside your data center's compute demand without a new capital project or grid upgrade.

03

Can on-site battery storage replace a utility grid connection for a data center?

Yes. SparkCharge's battery-first approach is engineered to carry your full rack load on its own, banking off-peak energy and dispatching it on demand, so your data center can run independent of the grid. Many sites pair BESS with PowerHub generation for zero-grid-connection operation, or use it as a bridge while a permanent utility connection is still in progress. Once the permanent utility connection is installed, SparkCharge equipment can be tied into the grid to maximize energy efficiency.

04

How fast can megawatt-scale power be deployed at a data center site?

Most SparkCharge data center deployments go live in as little as 14 days from site approval, compared to the multi-year timelines a new utility interconnection can require. Because the equipment is modular and mobile, there's no construction or delay standing between your racks and full power.