EV ChargingPaired with BESSCritical Loads

continous on-site power generation. no grid required.

Unlimited runtime. Anywhere you need it.

SparkCharge PowerHub generates clean, continuous power on-site, extending runtime indefinitely and keeping full-scale operations running where the grid can't reach.

Get Started

EV Charging

Paired with BATTERY

Critical Loads

PowerHub Generation, One System, Any Site, Any Fuel.

Run it standalone for prime power, or integrate it with the setup you already have. PowerHub adapts to every deployment.

Configuration 02

Paired with battery energy storage (BESS)

Combine PowerHub with a SparkCharge battery for effectively unlimited runtime, quieter, more fuel-efficient, and cleaner than a standalone generator.

Hybrid

Fuel-efficient

Low-noise

Contact us to power your site →
SparkCharge PowerHub generation unit

PowerHub Specs Engineered and Deployed to Your Site

SparkCharge builds a range of on-site generation systems, each sized for the job. These capabilities are shared across the your site, exact figures depend on the model we spec for your load.

Continuous output

Up to 5 MW

capacity

Unlimited

runtime

24/7

Deployment

In > 7 days

footprint

~1 parking spot

FUEL TYPE

Flexible

Get a custom PowerHub quote →
Charging-as-a-Service

Continuous Power. Zero Upfront Costs.

PowerHub delivers full-power EV charging where the grid can't; deployed, operated, and maintained by SparkCharge. You plug in and pay per kWh.

Off-grid $0 capex Fully managed
Explore Charging-as-a-Service →

Generating

PowerHub · Unit 01

350

kW OUTPUT

78% of rated

Runtime

24/7

Fuel level

92%

Load

71%

FAQ

PowerHub FAQ, On-Site Generation Questions Answered

Have another question? Reach out and our team will get you answers.

Contact Our Team ↗

01

What is a mobile PowerHub?

PowerHub is a mobile, on-site power generation system built for locations where the grid can't reach or can't supply enough capacity. Instead of waiting months for a utility upgrade, PowerHub deploys directly to your site and starts generating power in days. It's sized and configured per site, from a single unit to a multi-unit setup, and can run standalone or alongside other SparkCharge equipment.

02

How fast can a PowerHub unit be deployed on-site?

Most PowerHub deployments can go live in as little as 7 days from site approval, compared to the months or years a permanent grid connection or utility upgrade can take.

03

Can a PowerHub be paired with battery storage?

Yes. PowerHub can run standalone for prime power, or be paired with a SparkCharge BESS unit for a hybrid setup. Combining the two gives you longer runtime, quieter operation, and better fuel efficiency than a PowerHub running alone, while the battery absorbs load spikes and the PowerHub handles sustained demand.

04

What fueling options does PowerHub support?

PowerHub supports multiple fuel types, so you can choose the option that fits your site's existing fuel access and operating requirements. Our team helps determine the right configuration and fueling cadence during site assessment, so power output and refueling logistics are planned before deployment, not figured out after.

05

What sites is PowerHub built for?

PowerHub is built for any site where grid capacity is limited, delayed, or unavailable, including EV fleet depots, data centers, ports and logistics hubs, construction sites, and event or production locations. If your site needs reliable power now and can't wait on permanent infrastructure, PowerHub is designed to be ready when you need it.

Stop waiting. Start powering.

Get Power Now →